Loading...
Loading...
Industrial Wastewater Canada sizes and supplies oil & gas / produced water for plants in Burnaby, British Columbia. Local demand is driven by food & beverage, metal fabrication, biotech, electronics, discharging under Burnaby's sewer-use rules toward Fraser River / Burrard Inlet. Quote requests with flow rate and effluent type get a sized proposal.

Oil and water separate on their own, given time. The entire discipline of oil and gas wastewater treatment exists because nobody in the industry has that time, and because the last few percent of oil refuses to leave without help. Free oil rises and skims easily. Dispersed droplets need coalescing plates or gas flotation. Emulsified oil, stabilized by production chemicals and shear from pumps, needs chemistry to break before any mechanical device can touch it. Knowing which fraction dominates your stream decides the equipment, which is why we ask for an oil-in-water analysis before we quote anything.
The applications span the value chain. Upstream, produced water from Alberta and Saskatchewan wells carries oil, solids and dissolved salts, and is treated for reinjection, disposal, or reuse in waterfloods, where oil carryover fouls injection formations. Midstream terminals and truck washouts generate slop oil and tank bottoms. Downstream, refineries run API separators as the first line, followed by dissolved gas or air flotation ahead of biological treatment. Gas plants add their own stream: amine and glycol wastes that behave nothing like produced water and should never be mixed with it.
Our equipment for this sector includes API oil water separator packages built to the API 421 gravity-separation design method, corrugated and inclined plate coalescing separators for tighter footprints, induced and dissolved gas flotation units, skimmer systems, and coalescing filter vessels for final polishing where discharge or reinjection specs demand single-digit oil concentrations. For remote batteries and early-production facilities the package arrives skid-mounted and winterized.
Alberta Energy Regulator directives, Saskatchewan disposal rules and federal offshore regulations each define oil-in-water limits differently, so we design against your specific approval rather than a generic number.
Send us the analysis, the flow range and the destination of the water, whether that is disposal well, waterflood or surface discharge. The proposal that comes back will name the separation stages, the expected outlet quality at each, and the turndown behaviour, because oilfield flows never stay at design point for long. A practical note on solids: produced sand and fines shorten the life of every separation stage, so where the well history shows sand production we put hydrocyclones or filtration ahead of the separator rather than letting the API vessel become a settling basin.
Burnaby's industry concentrates in the Big Bend flats along the Fraser and the Still Creek corridor, some of the last close-in industrial land in Metro Vancouver. Food and beverage plants, metal fabricators, biotech firms and electronics manufacturers share those zones in a city of 249,000, and every significant discharger holds a waste discharge permit under GVS&DD Bylaw 299. Still Creek runs through the middle of it Still Creek is the detail that changes behaviour here. Still Creek—Big Bend industrial zone; GVS&DD Bylaw 299 permits. That is the regulatory backdrop for oil & Gas / Produced Water in Burnaby: equipment gets sized against the local limits on the route to Fraser River / Burrard Inlet, not against a national average.
Location
Burnaby, British Columbia
Population 249K
Receiving Water
Fraser River / Burrard Inlet
Pricing
Sized & quoted per project
With salmon-bearing Still Creek running straight through Burnaby's industrial corridor, wastewater diligence here goes beyond the Bylaw 299 permit, because a creek incident is public within hours. In Burnaby, the plants asking about oil & Gas / Produced Water are mostly in food & beverage, metal fabrication, biotech and electronics, and each of those sectors puts a different load on a treatment train. Still Creek—Big Bend industrial zone; GVS&DD Bylaw 299 permits. Direct discharge toward Fraser River / Burrard Inlet instead requires a waste discharge authorization under British Columbia's Environmental Management Act. In a city of Burnaby's size the industrial dischargers are few enough that the utility knows each one by name, which cuts both ways at permit renewal. Projects in Burnaby tend to be one-of-a-kind rather than repeat configurations, which is exactly the case where sizing from measured effluent data matters most.
Everything you need to know about our services.
Yes. Industrial Wastewater Canada sizes and supplies oil & Gas / Produced Water for plants across Burnaby and the surrounding region. Most local demand comes from food & beverage, metal fabrication, biotech, electronics. Send a quote request with your flow rate and effluent type and a sized proposal follows.
Still Creek—Big Bend industrial zone; GVS&DD Bylaw 299 permits. A salmon-bearing urban stream flowing directly through the industrial corridor means a spill or a cross-connection is visible within hours, in a region where stream stewardship groups are organized and vocal. Plants in the corridor invest in secondary containment, drain mapping and stormwater segregation beyond the letter of their permits because the reputational cost of a creek incident dwarfs the capital saved. Plants discharging to the municipal sewer answer to that regime; anything released directly toward Fraser River / Burrard Inlet needs a waste discharge authorization under British Columbia's Environmental Management Act. We size equipment against whichever limit governs your outfall.
From your numbers, not from the city's. We start with measured flow and effluent characterization, then check the result against Burnaby's local limits. A processor in a city of 249K with food & beverage as the dominant sector rarely has the same loading profile as its neighbours, so treatability data drives the selection.
There is no list price; every system is sized and quoted per project. The economics are local, though. On the process side the work is standard Metro Vancouver fare, DAF for food plants, oil-water separation and metals treatment for fabricators, batch neutralization for biotech, delivered into buildings where floor space is the scarcest input. Payback in Burnaby is usually calculated against those surcharge and compliance costs, and the quote spells that comparison out.
Flow, contaminants, discharge limit. An engineer replies with a sized treatment train and a quote — no obligation.