Loading...
Loading...
Industrial Wastewater Canada sizes and supplies lamella clarifiers for plants in Burnaby, British Columbia. Local demand is driven by food & beverage, metal fabrication, biotech, electronics, discharging under Burnaby's sewer-use rules toward Fraser River / Burrard Inlet. Quote requests with flow rate and effluent type get a sized proposal.

A lamella clarifier does what a conventional circular clarifier does, in about a tenth of the floor space. The trick is geometry. Instead of one large settling surface, the vessel stacks dozens of inclined plates, and each plate acts as its own shallow settling zone. Projected settling area multiplies while the tank stays compact, which is how a unit the size of a shipping container replaces a settling basin, cutting footprint by up to 90 percent.
Solids-laden water enters below the plate pack and rises between the plates. Particles settle onto the plate surfaces within a short vertical distance, slide down the incline into a collection hopper, and clarified water exits at the top through distribution orifices that keep flow even across the pack. There are no moving parts in the settling zone, so wear items are few and maintenance stays on the pumps and dosing systems where it belongs. The integrated sludge thickening hopper concentrates the underflow before it goes to dewatering, which shrinks the load on whatever press or centrifuge follows.
The applications where lamella clarifiers dominate are the ones where solids are the whole problem: mining and mineral processing water, construction and groundwater dewatering, metal finishing effluent after chemical precipitation, and industrial process water carrying grit or floc. Where the raw stream will not settle on its own, we add integrated flash-mix and flocculation stages ahead of the plate pack, so coagulant, polymer and settling happen in one skid. Vessel construction is 304 or 316 stainless or coated carbon steel, matched to the chemistry of your stream rather than defaulted.
Sizing a lamella clarifier is a solids problem, not a flow problem. Two streams at the same flow rate can need very different plate areas depending on particle size, floc strength and solids loading, which is why we ask for a lab analysis or at least a jar test before quoting, and why the 110 monthly Canadian searches for this equipment so often come from engineers replacing an undersized unit bought on flow rate alone. Send your flow, your solids data and your discharge destination, and we return a sized configuration, budget price and delivery timeline for your site, anywhere in Canada. Every proposal is reviewed by a process engineer first, and pilot units can be arranged where treatability is genuinely uncertain. Plate packs are removable for inspection and washing without dismantling the vessel, and replacement packs remain available for the life of the unit, so recovery from an upset upstream is a cleaning day rather than a capital request.
Burnaby's industry concentrates in the Big Bend flats along the Fraser and the Still Creek corridor, some of the last close-in industrial land in Metro Vancouver. Food and beverage plants, metal fabricators, biotech firms and electronics manufacturers share those zones in a city of 249,000, and every significant discharger holds a waste discharge permit under GVS&DD Bylaw 299. Still Creek runs through the middle of it Still Creek is the detail that changes behaviour here. Still Creek—Big Bend industrial zone; GVS&DD Bylaw 299 permits. That is the regulatory backdrop for lamella Clarifiers in Burnaby: equipment gets sized against the local limits on the route to Fraser River / Burrard Inlet, not against a national average.
Location
Burnaby, British Columbia
Population 249K
Receiving Water
Fraser River / Burrard Inlet
Pricing
Sized & quoted per project
With salmon-bearing Still Creek running straight through Burnaby's industrial corridor, wastewater diligence here goes beyond the Bylaw 299 permit, because a creek incident is public within hours. In Burnaby, the plants asking about lamella Clarifiers are mostly in food & beverage, metal fabrication, biotech and electronics, and each of those sectors puts a different load on a treatment train. Still Creek—Big Bend industrial zone; GVS&DD Bylaw 299 permits. Direct discharge toward Fraser River / Burrard Inlet instead requires a waste discharge authorization under British Columbia's Environmental Management Act. In a city of Burnaby's size the industrial dischargers are few enough that the utility knows each one by name, which cuts both ways at permit renewal. Projects in Burnaby tend to be one-of-a-kind rather than repeat configurations, which is exactly the case where sizing from measured effluent data matters most.
Everything you need to know about our services.
Yes. Industrial Wastewater Canada sizes and supplies lamella Clarifiers for plants across Burnaby and the surrounding region. Most local demand comes from food & beverage, metal fabrication, biotech, electronics. Send a quote request with your flow rate and effluent type and a sized proposal follows.
Still Creek—Big Bend industrial zone; GVS&DD Bylaw 299 permits. A salmon-bearing urban stream flowing directly through the industrial corridor means a spill or a cross-connection is visible within hours, in a region where stream stewardship groups are organized and vocal. Plants in the corridor invest in secondary containment, drain mapping and stormwater segregation beyond the letter of their permits because the reputational cost of a creek incident dwarfs the capital saved. Plants discharging to the municipal sewer answer to that regime; anything released directly toward Fraser River / Burrard Inlet needs a waste discharge authorization under British Columbia's Environmental Management Act. We size equipment against whichever limit governs your outfall.
From your numbers, not from the city's. We start with measured flow and effluent characterization, then check the result against Burnaby's local limits. A processor in a city of 249K with food & beverage as the dominant sector rarely has the same loading profile as its neighbours, so treatability data drives the selection.
There is no list price; every system is sized and quoted per project. The economics are local, though. On the process side the work is standard Metro Vancouver fare, DAF for food plants, oil-water separation and metals treatment for fabricators, batch neutralization for biotech, delivered into buildings where floor space is the scarcest input. Payback in Burnaby is usually calculated against those surcharge and compliance costs, and the quote spells that comparison out.
Flow, contaminants, discharge limit. An engineer replies with a sized treatment train and a quote — no obligation.