Loading...
Loading...
Industrial Wastewater Canada sizes and supplies oil & gas / produced water for plants in Surrey, British Columbia. Local demand is driven by food processing, wood products, metal fabrication, agritech, discharging under Surrey's sewer-use rules toward Fraser River. Quote requests with flow rate and effluent type get a sized proposal.

Oil and water separate on their own, given time. The entire discipline of oil and gas wastewater treatment exists because nobody in the industry has that time, and because the last few percent of oil refuses to leave without help. Free oil rises and skims easily. Dispersed droplets need coalescing plates or gas flotation. Emulsified oil, stabilized by production chemicals and shear from pumps, needs chemistry to break before any mechanical device can touch it. Knowing which fraction dominates your stream decides the equipment, which is why we ask for an oil-in-water analysis before we quote anything.
The applications span the value chain. Upstream, produced water from Alberta and Saskatchewan wells carries oil, solids and dissolved salts, and is treated for reinjection, disposal, or reuse in waterfloods, where oil carryover fouls injection formations. Midstream terminals and truck washouts generate slop oil and tank bottoms. Downstream, refineries run API separators as the first line, followed by dissolved gas or air flotation ahead of biological treatment. Gas plants add their own stream: amine and glycol wastes that behave nothing like produced water and should never be mixed with it.
Our equipment for this sector includes API oil water separator packages built to the API 421 gravity-separation design method, corrugated and inclined plate coalescing separators for tighter footprints, induced and dissolved gas flotation units, skimmer systems, and coalescing filter vessels for final polishing where discharge or reinjection specs demand single-digit oil concentrations. For remote batteries and early-production facilities the package arrives skid-mounted and winterized.
Alberta Energy Regulator directives, Saskatchewan disposal rules and federal offshore regulations each define oil-in-water limits differently, so we design against your specific approval rather than a generic number.
Send us the analysis, the flow range and the destination of the water, whether that is disposal well, waterflood or surface discharge. The proposal that comes back will name the separation stages, the expected outlet quality at each, and the turndown behaviour, because oilfield flows never stay at design point for long. A practical note on solids: produced sand and fines shorten the life of every separation stage, so where the well history shows sand production we put hydrocyclones or filtration ahead of the separator rather than letting the API vessel become a settling basin.
Surrey holds the fastest-growing industrial land base in British Columbia. As Vancouver's older districts run out of room, food processors, wood-products plants, metal fabricators and agritech operations keep landing in Campbell Heights, Port Kells and Newton, bringing the city past 568,000 residents. Every significant discharger connects to Metro Vancouver's system under GVS&DD Bylaw 299 and its waste discharge permits, with the Fraser River as the ultimate receiving water. Fastest-growing BC industrial land base; GVS&DD Bylaw 299 permits. That is the regulatory backdrop for oil & Gas / Produced Water in Surrey: equipment gets sized against the local limits on the route to Fraser River, not against a national average.
Location
Surrey, British Columbia
Population 568K
Receiving Water
Fraser River
Pricing
Sized & quoted per project
Surrey's new industrial parks mean most plants are getting their first Metro Vancouver discharge permit, and wastewater pretreatment designed into the greenfield build costs a fraction of the retrofit. In Surrey, the plants asking about oil & Gas / Produced Water are mostly in food processing, wood products, metal fabrication and agritech, and each of those sectors puts a different load on a treatment train. Fastest-growing BC industrial land base; GVS&DD Bylaw 299 permits. Direct discharge toward Fraser River instead requires a waste discharge authorization under British Columbia's Environmental Management Act. Surrey is big enough that the sewer utility samples industrial connections routinely, so an out-of-spec effluent gets noticed within a billing cycle. Projects in Surrey tend to be one-of-a-kind rather than repeat configurations, which is exactly the case where sizing from measured effluent data matters most.
Everything you need to know about our services.
Yes. Industrial Wastewater Canada sizes and supplies oil & Gas / Produced Water for plants across Surrey and the surrounding region. Most local demand comes from food processing, wood products, metal fabrication, agritech. Send a quote request with your flow rate and effluent type and a sized proposal follows.
Fastest-growing BC industrial land base; GVS&DD Bylaw 299 permits. New buildings, first permits What distinguishes Surrey is how many plants are getting their first permit rather than renewing an old one. A processor moving from a grandfathered Vancouver site into a new Campbell Heights building discovers that Metro Vancouver wants characterization data and a pretreatment plan before start-up, not after the first violation. Plants discharging to the municipal sewer answer to that regime; anything released directly toward Fraser River needs a waste discharge authorization under British Columbia's Environmental Management Act. We size equipment against whichever limit governs your outfall.
From your numbers, not from the city's. We start with measured flow and effluent characterization, then check the result against Surrey's local limits. A processor in a city of 568K with food processing as the dominant sector rarely has the same loading profile as its neighbours, so treatability data drives the selection.
There is no list price; every system is sized and quoted per project. The economics are local, though. That timing is an opportunity: pretreatment designed into a greenfield build costs a fraction of a retrofit and can be sized for the ten-year plan, not the opening-day flow. We spend much of our Surrey work at the drawing stage, keeping plants ahead of the permit instead of chasing it. Payback in Surrey is usually calculated against those surcharge and compliance costs, and the quote spells that comparison out.
Flow, contaminants, discharge limit. An engineer replies with a sized treatment train and a quote — no obligation.