Loading...
Loading...
Industrial Wastewater Canada sizes and supplies dissolved air flotation (daf) systems for plants in Surrey, British Columbia. Local demand is driven by food processing, wood products, metal fabrication, agritech, discharging under Surrey's sewer-use rules toward Fraser River. Quote requests with flow rate and effluent type get a sized proposal.

Dissolved air flotation earns its keep in one specific situation: wastewater loaded with fats, oils, grease and suspended solids that settle poorly or not at all. That is the daily reality of food and beverage plants, dairies, meat and poultry processors and rendering operations, which is why the DAF has become the default pre-treatment technology in those sectors across Canada.
The process is the inverse of settling. A portion of clarified effluent is saturated with air under pressure and released at the tank inlet, where it forms clouds of microbubbles. The bubbles attach to solids and grease particles, float them to the surface as a stable sludge blanket, and a skimmer removes the blanket continuously. With the integrated chemical dosing and flocculation tube on our units, coagulant and polymer conditioning happens in-line ahead of the flotation zone, and removal rates run from 90 to 99 percent on TSS and FOG when the chemistry is tuned to the stream.
The economics are usually driven by surcharges rather than fines. A plant discharging over-strength effluent to a Canadian municipality pays for it, either through an industrial waste surcharge agreement in much of Ontario or through permit conditions like Metro Vancouver's Bylaw 299. Those fees scale with production and never stop. A DAF is a one-time capital cost that cuts the surcharged load at the source, and we size every unit with that payback math in view, using your actual surcharge invoice where you have one. For many food processors the system pays for itself against fees alone.
Construction is stainless steel, and the compact skid packages arrive pre-piped and pre-wired, which keeps installation to utility connections and commissioning rather than a fabrication project on your floor. A DAF also protects whatever sits downstream: a biological system runs far more stably when the grease load is removed ahead of it, and a municipality sees a plant that holds its numbers.
Sizing a DAF from a brochure is guesswork. Sizing it from data takes three inputs: your peak flow rate, a lab analysis of the effluent or at minimum a description of the process producing it, and your discharge limits. Send those and we return a sized configuration, budget price and delivery timeline for your plant, anywhere in Canada, with every proposal reviewed by a process engineer first. Commissioning includes jar testing on site to lock in the coagulant and polymer recipe, and operator training is part of the startup scope, because a DAF tuned once and understood by the people running it holds its removal rates for years.
Surrey holds the fastest-growing industrial land base in British Columbia. As Vancouver's older districts run out of room, food processors, wood-products plants, metal fabricators and agritech operations keep landing in Campbell Heights, Port Kells and Newton, bringing the city past 568,000 residents. Every significant discharger connects to Metro Vancouver's system under GVS&DD Bylaw 299 and its waste discharge permits, with the Fraser River as the ultimate receiving water. Fastest-growing BC industrial land base; GVS&DD Bylaw 299 permits. That is the regulatory backdrop for dissolved Air Flotation (DAF) Systems in Surrey: equipment gets sized against the local limits on the route to Fraser River, not against a national average.
Location
Surrey, British Columbia
Population 568K
Receiving Water
Fraser River
Pricing
Sized & quoted per project
Surrey's new industrial parks mean most plants are getting their first Metro Vancouver discharge permit, and wastewater pretreatment designed into the greenfield build costs a fraction of the retrofit. In Surrey, the plants asking about dissolved Air Flotation (DAF) Systems are mostly in food processing, wood products, metal fabrication and agritech, and each of those sectors puts a different load on a treatment train. Fastest-growing BC industrial land base; GVS&DD Bylaw 299 permits. Direct discharge toward Fraser River instead requires a waste discharge authorization under British Columbia's Environmental Management Act. Surrey is big enough that the sewer utility samples industrial connections routinely, so an out-of-spec effluent gets noticed within a billing cycle. Projects in Surrey tend to be one-of-a-kind rather than repeat configurations, which is exactly the case where sizing from measured effluent data matters most.
Everything you need to know about our services.
Yes. Industrial Wastewater Canada sizes and supplies dissolved Air Flotation (DAF) Systems for plants across Surrey and the surrounding region. Most local demand comes from food processing, wood products, metal fabrication, agritech. Send a quote request with your flow rate and effluent type and a sized proposal follows.
Fastest-growing BC industrial land base; GVS&DD Bylaw 299 permits. New buildings, first permits What distinguishes Surrey is how many plants are getting their first permit rather than renewing an old one. A processor moving from a grandfathered Vancouver site into a new Campbell Heights building discovers that Metro Vancouver wants characterization data and a pretreatment plan before start-up, not after the first violation. Plants discharging to the municipal sewer answer to that regime; anything released directly toward Fraser River needs a waste discharge authorization under British Columbia's Environmental Management Act. We size equipment against whichever limit governs your outfall.
From your numbers, not from the city's. We start with measured flow and effluent characterization, then check the result against Surrey's local limits. A processor in a city of 568K with food processing as the dominant sector rarely has the same loading profile as its neighbours, so treatability data drives the selection.
There is no list price; every system is sized and quoted per project. The economics are local, though. That timing is an opportunity: pretreatment designed into a greenfield build costs a fraction of a retrofit and can be sized for the ten-year plan, not the opening-day flow. We spend much of our Surrey work at the drawing stage, keeping plants ahead of the permit instead of chasing it. Payback in Surrey is usually calculated against those surcharge and compliance costs, and the quote spells that comparison out.
Flow, contaminants, discharge limit. An engineer replies with a sized treatment train and a quote — no obligation.