Loading...
Loading...
Industrial Wastewater Canada sizes and supplies oil water separators for plants in Edmonton, Alberta. Local demand is driven by petrochemicals, refining, food processing, manufacturing, discharging under Edmonton's sewer-use rules toward North Saskatchewan River. Quote requests with flow rate and effluent type get a sized proposal.

Every vehicle wash bay, machine shop, fuel depot and refinery in Canada faces the same line item in its sewer-use bylaw: oil and grease, typically capped somewhere between 15 and 100 mg/L depending on the municipality. An oil water separator is the standard way to meet that cap. It exploits the density difference between oil and water: flow slows inside the vessel, droplets rise and coalesce into a surface layer that gets skimmed, and cleaned water leaves from below.
The choice that matters is between the two main designs. A gravity API separator is a long rectangular basin sized to Stokes' law, built to let droplets of roughly 150 microns and larger rise out. It is robust, tolerant of solids and easy to maintain, which is why refineries still standardize on it. A coalescing-plate separator adds inclined plate packs or oleophilic media that intercept far smaller droplets, down to about 20 to 60 microns, so it reaches better effluent quality in a fraction of the footprint. Our coalescing configurations hold effluent under 10 ppm oil and grease in free-oil service, and many sites pair an API basin with a coalescing polishing stage.
We quote both, in above-grade and below-grade tanks, with API 421 compliant configurations where the specification calls for it. Options include oil-stop valves that close automatically when the oil layer reaches capacity, high-level alarms, and sludge baffles for streams that carry grit. What a separator will not do is remove chemically emulsified or dissolved oil; if your stream carries surfactants from a wash process, we will tell you plainly that you need chemical treatment or flotation ahead of the separator, because selling you a tank that cannot meet your limit helps neither of us.
Sizing depends on flow rate, droplet size distribution and oil type, which is why the search term oil water separator, at 480 searches a month in Canada, so often ends in a mis-sized purchase from a catalogue. Send us your flow, a recent lab analysis or a description of the process, and your discharge destination. We return a sized configuration, budget price and delivery timeline, reviewed by a process engineer before it reaches you, for any site in Canada. Installation support and commissioning are quoted per project, and replacement plate packs and media remain available for the life of the vessel. Below-grade installations ship with traffic-rated covers where the separator sits in a drive lane, and we keep skimmer parts and alarm components on the shelf so a maintenance call does not become a compliance gap.
Edmonton anchors the Alberta Industrial Heartland, the largest hydrocarbon processing cluster in Canada, and its wastewater market reflects that scale. Refineries, petrochemical plants and upgraders northeast of the city hold EPEA approvals as direct dischargers to the North Saskatchewan River, while inside the city itself, food processors and manufacturers discharge to municipal sewer under EPCOR's oversight. EPEA approvals versus sewer discharge The split matters commercially. Alberta Industrial Heartland — largest hydrocarbon processing cluster in Canada, EPEA approvals for direct dischargers. That is the regulatory backdrop for oil Water Separators in Edmonton: equipment gets sized against the local limits on the route to North Saskatchewan River, not against a national average.
Location
Edmonton, Alberta
Population 1,011K
Receiving Water
North Saskatchewan River
Pricing
Sized & quoted per project
Between the Industrial Heartland's EPEA-permitted refineries and the city's sewer-discharging food plants, every Edmonton wastewater system gets engineered for −35 °C winters from the first drawing. In Edmonton, the plants asking about oil Water Separators are mostly in petrochemicals, refining, food processing and manufacturing, and each of those sectors puts a different load on a treatment train. Alberta Industrial Heartland — largest hydrocarbon processing cluster in Canada, EPEA approvals for direct dischargers. Direct discharge toward North Saskatchewan River instead requires an approval under Alberta's Environmental Protection and Enhancement Act. A metro of Edmonton's size runs enough industrial flow that the municipal plant polices its intake closely, and surcharge invoices arrive on schedule. Projects in Edmonton tend to be one-of-a-kind rather than repeat configurations, which is exactly the case where sizing from measured effluent data matters most.
Everything you need to know about our services.
Yes. Industrial Wastewater Canada sizes and supplies oil Water Separators for plants across Edmonton and the surrounding region. Most local demand comes from petrochemicals, refining, food processing, manufacturing. Send a quote request with your flow rate and effluent type and a sized proposal follows.
Alberta Industrial Heartland — largest hydrocarbon processing cluster in Canada, EPEA approvals for direct dischargers. A direct discharger's approval sets site-specific limits on everything from ammonia to naphthenic acids, with continuous monitoring obligations, and a treatment upgrade there is a multi-discipline engineering project. A sausage plant on the south side, by contrast, needs a DAF and a surcharge strategy. Plants discharging to the municipal sewer answer to that regime; anything released directly toward North Saskatchewan River needs an approval under Alberta's Environmental Protection and Enhancement Act. We size equipment against whichever limit governs your outfall.
From your numbers, not from the city's. We start with measured flow and effluent characterization, then check the result against Edmonton's local limits. A processor in a city of 1,011K with petrochemicals as the dominant sector rarely has the same loading profile as its neighbours, so treatability data drives the selection.
There is no list price; every system is sized and quoted per project. The economics are local, though. Winter is the constant across both: process water that arrives at 60 °C in July still has to move through outdoor piping at −35 °C in January, so heat tracing, building enclosures and freeze-protected instrumentation are part of every Edmonton design, not options added later. Payback in Edmonton is usually calculated against those surcharge and compliance costs, and the quote spells that comparison out.
Flow, contaminants, discharge limit. An engineer replies with a sized treatment train and a quote — no obligation.