Loading...
Loading...
Industrial Wastewater Canada sizes and supplies dissolved air flotation (daf) systems for plants in Calgary, Alberta. Local demand is driven by oil & gas services, food processing, chemicals, logistics, discharging under Calgary's sewer-use rules toward Bow River. Quote requests with flow rate and effluent type get a sized proposal.

Dissolved air flotation earns its keep in one specific situation: wastewater loaded with fats, oils, grease and suspended solids that settle poorly or not at all. That is the daily reality of food and beverage plants, dairies, meat and poultry processors and rendering operations, which is why the DAF has become the default pre-treatment technology in those sectors across Canada.
The process is the inverse of settling. A portion of clarified effluent is saturated with air under pressure and released at the tank inlet, where it forms clouds of microbubbles. The bubbles attach to solids and grease particles, float them to the surface as a stable sludge blanket, and a skimmer removes the blanket continuously. With the integrated chemical dosing and flocculation tube on our units, coagulant and polymer conditioning happens in-line ahead of the flotation zone, and removal rates run from 90 to 99 percent on TSS and FOG when the chemistry is tuned to the stream.
The economics are usually driven by surcharges rather than fines. A plant discharging over-strength effluent to a Canadian municipality pays for it, either through an industrial waste surcharge agreement in much of Ontario or through permit conditions like Metro Vancouver's Bylaw 299. Those fees scale with production and never stop. A DAF is a one-time capital cost that cuts the surcharged load at the source, and we size every unit with that payback math in view, using your actual surcharge invoice where you have one. For many food processors the system pays for itself against fees alone.
Construction is stainless steel, and the compact skid packages arrive pre-piped and pre-wired, which keeps installation to utility connections and commissioning rather than a fabrication project on your floor. A DAF also protects whatever sits downstream: a biological system runs far more stably when the grease load is removed ahead of it, and a municipality sees a plant that holds its numbers.
Sizing a DAF from a brochure is guesswork. Sizing it from data takes three inputs: your peak flow rate, a lab analysis of the effluent or at minimum a description of the process producing it, and your discharge limits. Send those and we return a sized configuration, budget price and delivery timeline for your plant, anywhere in Canada, with every proposal reviewed by a process engineer first. Commissioning includes jar testing on site to lock in the coagulant and polymer recipe, and operator training is part of the startup scope, because a DAF tuned once and understood by the people running it holds its removal rates for years.
Calgary sits at the junction of two wastewater markets. Inside city limits, well over a million people and a growing base of food processors, chemical blenders and logistics operators discharge under Wastewater Bylaw 14M2012, with the Bow River as the receiving water. Outside the city, the surrounding basin runs on produced water and work-camp utilities, a market with no municipal sewer at all. City of Calgary Wastewater Bylaw 14M2012; large produced-water and camp wastewater market in surrounding basin. That is the regulatory backdrop for dissolved Air Flotation (DAF) Systems in Calgary: equipment gets sized against the local limits on the route to Bow River, not against a national average.
Location
Calgary, Alberta
Population 1,307K
Receiving Water
Bow River
Pricing
Sized & quoted per project
Calgary plants answer to Bylaw 14M2012 and a trout river with no assimilative capacity to spare, while an hour away the produced-water market needs wastewater treatment skids that run unattended at −30 °C. In Calgary, the plants asking about dissolved Air Flotation (DAF) Systems are mostly in oil & gas services, food processing, chemicals and logistics, and each of those sectors puts a different load on a treatment train. City of Calgary Wastewater Bylaw 14M2012; large produced-water and camp wastewater market in surrounding basin. Direct discharge toward Bow River instead requires an approval under Alberta's Environmental Protection and Enhancement Act. A metro of Calgary's size runs enough industrial flow that the municipal plant polices its intake closely, and surcharge invoices arrive on schedule. We quote dissolved Air Flotation (DAF) Systems in Calgary often, and the sizing conversation usually starts from a surcharge bill or a compliance letter rather than from a catalogue.
Everything you need to know about our services.
Yes. Industrial Wastewater Canada sizes and supplies dissolved Air Flotation (DAF) Systems for plants across Calgary and the surrounding region. Most local demand comes from oil & gas services, food processing, chemicals, logistics. Send a quote request with your flow rate and effluent type and a sized proposal follows.
City of Calgary Wastewater Bylaw 14M2012; large produced-water and camp wastewater market in surrounding basin. Bow River limits meet oilfield volumes The Bow is a cold, clear trout river with little assimilative capacity to spare, so the city keeps its bylaw limits tight and its sampling frequent. Meanwhile an oil and gas service company an hour away may need to treat 500 m³/day of produced water to reuse or disposal standards with nothing but a skid and a generator. Plants discharging to the municipal sewer answer to that regime; anything released directly toward Bow River needs an approval under Alberta's Environmental Protection and Enhancement Act. We size equipment against whichever limit governs your outfall.
From your numbers, not from the city's. We start with measured flow and effluent characterization, then check the result against Calgary's local limits. A processor in a city of 1,307K with oil & gas services as the dominant sector rarely has the same loading profile as its neighbours, so treatability data drives the selection.
There is no list price; every system is sized and quoted per project. The economics are local, though. We design for both ends: sewer-compliance pretreatment for plants inside Calgary, and self-contained packaged systems for camps and well sites where winter operation at −30 °C is a design requirement, not an edge case. Payback in Calgary is usually calculated against those surcharge and compliance costs, and the quote spells that comparison out.
Flow, contaminants, discharge limit. An engineer replies with a sized treatment train and a quote — no obligation.